Alignment is a big stage, and we have lots of photos.  We're still on March 2 and 3 here.  You can see that all furniture and bulkheads are tabbed right to the hull, and there is no hull liner.

 

 

 

On the right is the salon port settee, which was built in the woodshop and is just being installed along the hull and forward bulkhead.  The floors are well along, although the bilge covers are not yet in place.

 

 

 

 

 

 

Here we have the starboard salon settee with the back installed.  The unit is sitting on the factory floor alongside the boat, ready to be installed.

    

Thanks to Tony, on the left the galley has now been installed, and on the right the starboard settee and the nav station are in place.

 

 

 

 

 

Here we have Tony putting the final touches on the V-Berth before he drops her into the boat.  Our trusty boat parent and camerawoman Amanda was on hand for the event, which she captured in full motion below.

         

Go Tony!

 

Feb 24-Mar 2  March 3 - 7  March 7  March 29

 

Const. Home  Gel & Glass  Birth!  Carpentry  Varnish Shop  Interior  Engine  Deck

Deck Install  April 5 Pics  April 5 Pics  April 21 Pics  Boatbuilders

 
 

Bruce and Dorsey Beard

info@esmeralde.net